Ask the installer to identify the applicable process
In Great Britain, G98 and G99 are relevant generation connection routes. National Grid Electricity Distribution explains that G99 covers installations above the G98 threshold or those not meeting G98 requirements. That is a starting point, not a way to approve your own project. Ask the installer to confirm the correct route with the relevant network operator. For a Northern Ireland site, use its network operator’s process rather than assuming Great Britain guidance applies.
Distinguish the design from a confirmed connection position
Ask whether the proposal is an early design, an application-ready scheme or a scheme with a documented network response. Request an explanation of any assumed export limit and how it affects the proposed equipment or operation. Do not treat a sales quote as evidence that the network will accept the requested capacity. Record who will make the application or notification and what information you must provide.
Put uncertain costs in plain sight
Request a breakdown of application-related work, studies, testing and any network works or fees included in the price. Ask which items are estimates and what could trigger a revised quotation. If the installer suggests alternative capacities, ask for the reason and the impact on the project scope. This makes it easier to compare bidders without mistaking an unresolved allowance for a firm saving.
Start with the site information you already hold
Include the site postcode, industrial activity, operating pattern and supply information if known. Tell installers about existing generation or storage and any previous network correspondence, without placing confidential documents in the initial message. You can request quotes before every technical detail is settled. The useful outcome is a proposal that identifies the outstanding checks clearly, allowing you to decide how to progress once suitable participating installers respond.
Your enquiry checklist
- Existing generation or storage
- Known supply information
- Application and notification responsibilities
- Export assumptions, exclusions and provisional fees
You can still enquire if you do not have all of this information. The form below starts with the essentials.
UK sources and scope
This is a buying guide, not a site assessment or individual financial or legal advice. UK nation-specific rules and project suitability should be checked for your property.